Monday, November 21, 2011

Greetings everyone Our building renovation work is picking up pace.


The following important progress has been or is being made:

  • The painting of the wall behind the altar is in process. It's now a silvery color that will be highlighted with touches of bronze/gold in places. 
  • Our new font is complete and awaits installation in mid-December. 
  • The wood for the top portion of the altar is being prepared, and, I might add, is rich and beautiful. Julie is preparing the reliquary box (a bronze inset piece) that will hold our relic and a small portion of Father Ralph Carksadden's ashes. 
  • The new entryway is fully enclosed, giving us an idea of just how large that space will be--and it will be large! 
  • The pews are being repaired and stained a warm walnut color. 
  • The new bathroom is enclosed, ready for finishing. 
  • All the side windows have been removed. *New lighting is being installed. 
  • Our furnaces are being replaced. 
  •  We're still planning on being back in the space on Christmas Eve. Most everything but the interior colored glass will be complete (the outside clear safety glass that "seals" the space will be in place).  
All my thankfulness to you and to God as we make this journey together, +Melissa


Wednesday, October 19, 2011

Wood for New Altar

A group from the Building Renovation Team along with artist Julie Speidel went to O.B. Williams in Seattle where the new altar wood is being finished.  We got to see the slab of Walnut before final work on it. 

The slab is now just shy of 6 inches thick has come through the curing process well (it was drying in a kiln for 5 months!). The team at O.B. Williams said it was the thickest piece of walnut they have ever worked with.

The portion to be carved out for the bronze reliquary box will be about 5 inches by 14 inches so we will have a roomy space for Gregory the Great and some of the ashes of Father Ralph Carskadden.
Mother Melissa Skelton at O.B. Williams

Sidewalk and entry slab pour

Attached are a few pictures of last week’s sidewalk and entry slab pour. This week we will begin erecting steel at the front entrance, as well as start the wood framing for the interior walls, which will also initiate the electrical and plumbing rough in. Enjoy the pics!